Memorial Health
Legal name: Memorial Health System
Nonprofit profile at a glance
- EIN
- 371110690
- IRS 990 coverage
- 2009–2024
- Official website data refreshed
- Sep 2026
- Forms available
- Form 990 2024, Form 990-T 2024
- Location
- Springfield, IL, USA
- Phone
- 217-788-7070
- Rating
- 82
- Verdict
- STRONG
- Rating confidence
- Moderate
- Sector
- Community Health Systems
Reported finances
- Revenue
- $212,366,103
- Expenses
- $202,123,706
- Assets
- $673,633,135
- Liabilities
- $393,047,692
Source: IRS Form 990. Selected filing: tax year 2024. Amounts in USD.
Leadership & pay
41 people listed
Executive titles in this filing
- EDGAR CURTIS (PRESIDENT & CEO (THRU MAR25))
- MANDY EATON (PRESIDENT & CEO (FRM APR25))
- DOLAN DALPOAS (PRESIDENT & CEO LMH)
- DREW EARLY (PRESIDENT & CEO DMH)
- KIMBERLY BOURNE (PRESIDENT & CEO TMH)
- J TRAVIS DOWELL (PRESIDENT & CEO MMG (THRU JUN24))
Highest reported compensation
- EDGAR CURTIS (PRESIDENT & CEO (THRU MAR25)): $2,607,083 total reported compensation
- KEVIN ENGLAND (SVP & CAO (THRU JUL25)): $1,207,115 total reported compensation
- KATHRYN KEIM (SVP & CFO): $1,130,982 total reported compensation
Source: IRS Form 990. Selected filing: tax year 2024. Names and roles reflect this filing, not necessarily current officeholders.
Overview
Mission
Volunteer '' One of the leading healthcare organizations in Illinois, Memorial Health is a community-based, not-for-profit organization that provides a full range of inpatient, outpatient, home health, hospice, behavioral health and primary care physician services. With numerous sites of care throughout central Illinois, we deliver high-quality, patient-centered care in support of our mission to improve lives and build stronger communities through better health.
What it reported doing in 2024
Building and facility expansion and improvements memorial health's mission is to improve lives and build stronger communities through better health. Safe, functional facilities are the foundation of the healthcare services we provide. Clinical projects that began in fy 2025: dmh linear accelerator room 219 - replacement of truebeam linac vault 219 at the cancer center involves equipment replacement, finish upgrades, power conditioner moves, chiller replacement and nelco repairs to the vault door. Dmh plaza west renovations for siu -with 2/3 of the building vacant and siu wanting more space and a presence at dmh, dmh will move out the remaining neuro and gastro groups, leaving behind only the endo suite, letting siu lease the rest of the three-story building for internal medicine, ob/fms, pediatrics, and surgery groups. Smh ed ct replacement - replacement of ed ct and bringing finishes up to date. This will involve physicists' tests, a removal of a wall to bring the equipment in, and some phasing within the corridors surrounding the space. This also includes some work in the control room including setting a ups. Smh baylis alpha ct replacement - replacement of alpha ct in the baylis building and bringing finishes up to date. This will involve physicists tests, a removal of a wall to bring the equipment in, and some phasing within the corridors surrounding the space. Smh 5c icu renovation - the goal is to provide additional recovery bays for cv & cath on 6c by using all the existing bays and patient rooms on 6c as recovery and moving all icu patients down to 5c. This would help with throughput for surgeries and increase volume while still maintaining the amount of icu beds needed. 5c would include flooring, ceiling, paint, new headwall systems, removal of old tubs, repairs or new casework throughout, potential controls for hvac, and more. Jmh lab and ed roof replacement - the lab and ed roof at jmh has outlived its life span, and the last several years, have been suffering roof leaks throughout the year, and have had to have repair after repair done to this area. By replacing the roof now, we will eliminate the inconvenience of stained tile in clinical areas, and the time of engineering to replace the wet tile, and chase leaks down, as well as the expense of patching the old roof. Mh baylis ramp repairs (phase iii) - the last phase of the baylis ramp repairs. The baylis parking ramp continued to see heavy deterioration to the point where we needed to invest money over the next 4 years to prolong the life of the structure. Work included sealing and coating all decks, repairs to any structural damage, repairs to concrete stairs and pans failing, utilities that are a life safety concern due to rusting and exposure to weather. Mh 2401 w. Jefferson epic renovation - to support the operational needs for the epic team and to optimize space utilization, we are proposing a comprehensive reconfiguration of the fourth floor within 2401 jefferson. The objective is to accommodate 95 analysts, 11 manager offices, 3 this initiative is designed to provide adequate space and support for all staff while promoting team proximity, operational efficiency, and flexible workspace solutions. It also ensures the floor is configured for long-term success and aligns with future plans to similarly optimize additional floors across that building. Smh siemens agile max equipment replacement room a126 - replacement of agile max equipment in room a126 bringing finishes up to date. Dmh plant ats replacement - replacing the current 2000a ats with a closed transition, isolation bypass unit. Replacing this ats will require a significant amount of re-work in the plant. It will also require renting of a temporary ats during the duration of the re-work. The new ats will also include a 2000a service entrance circuit breaker. This breaker will replace the existing obsolete bolt lock service entrance disconnect that feeds this transfer switch. It is the opinion of facil
Operating model
- Revenue model
- Other-operating. 98% of the money available for current operations came from other operating revenue.
- Distribution model
- Direct operator. The filing allocates 100% of reported program-service expenses outside its grant, affiliate-payment, and member-benefit lines. This expense classification does not rule out separately announced grant awards.
The verdict
STRONG - A large share of available resources goes toward mission work and the filed numbers largely add up. Expenses are high relative to revenue and reported officer compensation is a large share of total spending, which may reflect staffing concentration.
Rating breakdown
- Financial Efficiency: 70
- Transparency & Controls: 91
- Accountability: 94
- Sustainability: 54
- Growth: 100
Detailed rating inputs
Financial Efficiency
- Mission deployment rate: 81.4%; rating input score 81
- Program expense ratio: 73.6%; rating input score 74
- Fundraising efficiency: Limited
Transparency & Controls
- Consistency checks: 100%; rating input score 100; 68th percentile among comparable filings
- Pay-setting controls: 4 of 6 controls in place; rating input score 67
- Compensation committee: Pass
- Independent consultant: Pass
- Other Form 990s reviewed: Missing
- Written employment contract: Missing
- Compensation survey or study: Pass
- Board or committee approval: Pass
- Foreign activity oversight: Limited
- Grant itemization coverage: 100%; rating input score 100; 77th percentile among comparable filings
- Major donor itemization: Limited
- Related-party transparency: Yes; rating input score 100
Accountability
- Independent voting board: 89.5%; rating input score 89; 37th percentile among comparable filings
- Governance controls: 9 of 9 controls in place; rating input score 100
- Conflict-of-interest policy: Pass
- Whistleblower policy: Pass
- Document-retention policy: Pass
- CEO compensation review process: Pass
- Other executive compensation review process: Pass
- Form 990 shared with the board: Pass
- Board meeting minutes documented: Pass
- Audit committee oversight: Pass
- Independent financial-statement audit: Pass
Sustainability
- Operating margin: 4.8%; rating input score 56; 56th percentile among comparable filings
- Total-asset coverage ratio: 3.33; rating input score 78; 78th percentile among comparable filings
- Liabilities to assets ratio: 0.58; rating input score 29; 29th percentile among comparable filings
- Officer compensation ratio: 7%; rating input score 7; 7th percentile among comparable filings
Growth
- Program expense growth: 12.6% per year; rating input score 100; 82nd percentile among comparable filings
- Revenue growth: 9.6% per year; rating input score 100; 75th percentile among comparable filings
- Asset growth: 9.3% per year; rating input score 100; 66th percentile among comparable filings
Details
- What they do: 1 programs and campaigns described on the official site · 1 operating location identified
- Where the money goes: 81.4% of revenue deployed · 73.6% of spending went to programs
- Governance: 17 of 19 board members independent · 9 of 9 filing controls reported
- Programs: 4 filed program accomplishments · $148.7M in reported program spending
- Leadership: top reported pay $2.6M · 41 people listed · 4 of 6 pay-setting controls reported
- Highest-paid contractors: 5 contractors listed · $21M reported
- Consistency: 37 of 37 current checks pass
- Schedules: 9 filed schedules · includes grants, executive pay, and related organizations
- Filing history: 16 filing years from 2009 to 2024
- Contacts: How to reach this organization
- Money network: 33 filed money-flow records
- Related organizations: 18 filed related-organization links
- Grant readiness: Federal tax and exclusion status, award history, and grant-maker relationships.
- People: Everyone the filings name, and which of them the filings identify by more than a name.
Key Signals
Signals prioritize questions for review. They are not findings of misconduct.
- Review — Sustainability: Operating margin scored 56/100.
- High — Sustainability: Officer compensation ratio scored 7/100.
- High — Sustainability: Liabilities to assets ratio scored 29/100.