Tri-State Steelheaders

Nonprofit profile at a glance

EIN
911244161
IRS 990 coverage
2010–2025
Forms available
Form 990 2025
Location
Walla Walla, WA, USA
Phone
5095293543
Rating
78
Verdict
SUPPORTED
Rating confidence
Moderate

Official website

Reported finances

Revenue
$1,139,219
Expenses
$1,114,452
Assets
$398,042
Liabilities
$15,812

Source: IRS Form 990. Selected filing: tax year 2016. Amounts in USD.

Leadership & pay

10 people listed

Executive titles in this filing

Highest reported compensation

  • BRIAN BURNS (EXECUTIVE DI): $62,897 total reported compensation

Source: IRS Form 990. Selected filing: tax year 2016. Names and roles reflect this filing, not necessarily current officeholders.

Overview

Mission

Our mission is to restore sustainable populations of native fish species.

What it reported doing in 2016

Overview tri-state steelheaders is a community-based non-profit organization that has been actively involved in salmonid habitat restoration since its inception in the mid-1960s. The group was granted 501(c)(3) status by Washington state in 1989 and was designated a regional fisheries enhancement group in 2000. Projects are funded by grants from state and federal agencies, private foundations, and corporate sponsors. (continued on schedule o) first accomplishment (cont) our organization receives valuable support from the walla walla community as well and thanks to generous donations from individuals and businesses, the steelheaders' 2016 crab feed fundraiser netted 22,600 for education and youth events. In 2016, volunteers donated over 495 hours to support our mission. Restoration mill creek fish passage - 9th ave extension construction was completed to improve fish passage in 1,050 feet of concrete flood channel. Existing conditions create water depths and velocities that are unfavorable to fish passage. Modifications to the channel added resting pools and created depths and velocities of water that are passable to adult and juvenile summer steelhead, spring chinook, and bull trout. The project was funded by the salmon recovery funding board and the confederated tribes of the umatilla indian reservation. Mill creek fish passage - upper flume design while construction was underway in the lower end of the channel at 9th avenue, planning and design was occurring in the uppermost mile of the concrete flood channel. Surveying, hydraulic modelling, and channel design were conducted to address the passage problems posed by the channel. Construction ready plans are scheduled for completion in mid-2017. Bridge to bridge final restoration design following the bridge to bridge levee removal construction phase, final designs were completed for the 1.5 miles of the walla walla river downstream of the completed phase. The intended benefits of the project are improved instream habitat, improved riparian habitat, and improved floodplain function. The final design and plans were used to apply for construction funding. The project was funded by Washington's salmon recovery funding board. Brewer wetland five acres within the 23 acre wetland restoration site were improved and planted. After grading in late 2015, the five acres were enclosed with deer fencing, seeded with a native grass mix, and planted with over 5,000 trees and shrubs in the spring of 2016. George creek wildlife area restoration the george creek project in asotin county was constructed in 2015 and plantings were completed in early 2016. Large wood structures were installed on a 0.7 mile reach to improve instream and floodplain habitats. Over 5,100 trees and shrubs planted here will help to jump-start the natural recovery of riparian buffers. The project was a partnership with Washington department of fish and wildlife, and was funded by the salmon recovery funding board. Lions park pond conceptual design this youth fishing pond in college place has water quality problems that reduce the amount of fish that are stocked by Washington department of fish and wildlife. In partnership with the city of college place, lions club, and concerned citizens, we began design work that will lead to a conceptual design and report. This conceptual plan is critical first step for future fundraising, and for advancing the plans from conceptual to final. The ultimate goal is to eliminate safety hazards, improve pond and stream water quality, and improve the youth fishing opportunities at the pond.

Operating model

Revenue model
Grant-funded. 96% of the money available for current operations came from government grants.
Distribution model
Direct operator. The filing allocates 100% of reported program-service expenses outside its grant, affiliate-payment, and member-benefit lines. This expense classification does not rule out separately announced grant awards.

The verdict

SUPPORTED - A large share of available resources goes toward mission work and the filed numbers largely add up. Some filing-based governance responses are negative or unanswered and program spending has declined or grown slowly.

Rating breakdown

  • Financial Efficiency: 78
  • Transparency & Controls: 90
  • Accountability: 74
  • Sustainability: 41
  • Growth: 60

Detailed rating inputs

Financial Efficiency

  • Mission deployment rate: 87.4%; rating input score 87
  • Program expense ratio: 89.3%; rating input score 89
  • Fundraising efficiency: Limited

Transparency & Controls

  • Consistency checks: 100%; rating input score 100; 62nd percentile among comparable filings
  • Pay-setting controls: Limited
  • Foreign activity oversight: Limited
  • Grant itemization coverage: Limited
  • Major donor itemization: Limited
  • Related-party transparency: Limited

Accountability

  • Independent voting board: 100%; rating input score 100; 63rd percentile among comparable filings
  • Governance controls: 3 of 8 controls in place; rating input score 38
    • Conflict-of-interest policy: Pass
    • Whistleblower policy: Pass
    • Document-retention policy: Fail
    • CEO compensation review process: NotApplicable
    • Other executive compensation review process: Fail
    • Form 990 shared with the board: Fail
    • Board meeting minutes documented: Pass
    • Audit committee oversight: Missing
    • Independent financial-statement audit: Fail

Sustainability

  • Operating margin: 2.2%; rating input score 46; 46th percentile among comparable filings
  • Total-asset coverage ratio: 0.36; rating input score 19; 19th percentile among comparable filings
  • Liabilities to assets ratio: 0.04; rating input score 64; 64th percentile among comparable filings
  • Officer compensation ratio: 5.6%; rating input score 54; 54th percentile among comparable filings

Growth

  • Program expense growth: -12.7% per year; rating input score 0; 8th percentile among comparable filings
  • Revenue growth: 0.9% per year; rating input score 100; 32nd percentile among comparable filings
  • Asset growth: 6.5% per year; rating input score 100; 58th percentile among comparable filings

Details

  • Where the money goes: 87.4% of revenue deployed · 89.3% of spending went to programs
  • Governance: 10 of 10 board members independent · 3 of 8 filing controls reported
  • Programs: 3 filed program accomplishments · $995K in reported program spending
  • Leadership: top reported pay $63K · 10 people listed
  • Highest-paid contractors: Vendors paid more than $100,000 for services
  • Consistency: 31 of 31 current checks pass
  • Schedules: 4 filed schedules
  • Filing history: 15 filing years from 2010 to 2025
  • Contacts: How to reach this organization
  • Money network: 1 filed money-flow record
  • Related organizations: Filed and resolved organization relationships.
  • Grant readiness: Federal tax and exclusion status, award history, and grant-maker relationships.
  • People: Everyone the filings name, and which of them the filings identify by more than a name.

Key Signals

Signals prioritize questions for review. They are not findings of misconduct.

  • Moderate — Accountability: Governance controls: 4 of 7 not reported.
  • High — Growth: Program expense growth scored 0/100.
  • Moderate — Sustainability: Operating margin scored 46/100.
  • High — Sustainability: Total-asset coverage ratio scored 19/100.
  • Review — Sustainability: Officer compensation ratio scored 54/100.