Eco Servants

Nonprofit profile at a glance

EIN
201272940
IRS 990 coverage
2010–2024
Forms available
Form 990 2024
Location
Ruidoso, NM, USA
Phone
5758081204
Rating
86
Verdict
STRONG
Rating confidence
Moderate
Sector
Natural Resources Conservation and Protection

Reported finances

Revenue
$563,225
Expenses
$616,505
Assets
$83,185
Liabilities
$11,683

Source: IRS Form 990. Selected filing: tax year 2017. Amounts in USD.

Leadership & pay

4 people listed

Executive titles in this filing

Highest reported compensation

Source: IRS Form 990. Selected filing: tax year 2017. Names and roles reflect this filing, not necessarily current officeholders.

Overview

Mission

Natural resource preservation and restoration

What it reported doing in 2017

Americorps fye projects: 1. Performance measure en-5 number of miles of trails or waterways (owned/maintained by national, state, county, city or tribal governments: nonprofits when for public use or the public good; and public easements) that are treated and/or constructed. 2. 12 miles were treated and 6.7 miles of new trail built. 3. 18 miles is our goal: 6 miles of new trail and 12 miles of treated trail. 4. 6.7 miles of new trail constructed. Constructed: making new trails available by implementing safety measures, making handicapped accessible, or environmental protection measures such as boardwalks, grading, trail-blazing, converting a railroad bed to a trail, etc. That make trails newly available. 5. Eco servants created 6 miles of new trail on united states department of agriclulture - forest service (usda-fs), lincoln national forest - smokey bear district. Trail was build 3.5 feet wide with a 6% out- slope on the tread. The corridor was cleared of vegetation to 12 feet high and 3 feet on each side for a multi-use trail (hikers, mountain bikes and equestrians). Two of the trails were buildt to be black rating or difficult level and other two were built blue rating or medium level. The trails and lengths are: t-92 to geriatric 2.3 miles cedar creek to t-92 1.9 miles t-93 to cedar creek 1.6 miles t-92 entrance 0.9 miles 6. We created 4 new trails at the instruction and supervision of the usda-fs in cedar creek and perk canyon areas. These trails were constructed due to the user created trails in the area were dangerous and unsustainable. 7. 11.7 miles of treated trail treated: removed invasive species, planted native plants, buildt riparian buffers, improved tread/corridorof existing trail or made changes to increase the trail lifespan, removed unsafe trail structures, repaired damage caused by visitor use, made changes to increase accessibility, cleared of natural debris (such as fallen trees/limbs and hazardous fuel)and unnatural debris (such as disaster debris and improperly disposed waste). Treatments must go beyond basic trash removal. 8. Eco servants treated 11.7 miles of trail on usda-fs - smokey bear district, usda-fs - sacramento district and bureau of land mgmt - roswell field office lands. 9. On smokey bear district we treated 3 trails: lower grindstone - 2.7 miles of: improving tread by removing berms from edge of trail, restoring flat flat out-sloped trail and removed vegetation from the tread. Changes to increase accessibility by clearing corridor of vegetation changes to increase trail lifespan by building grade-dips to shed water and repairing tread affected by erosion. Repair damage caused by visitor usage by repairing ruts and braiding 10. T-13, north and south cedar creek - 1.5 miles of: improving tread by removing berms from edge of trail, restoring flat out-sloped trail and removed vegetation from the tread. Changes to increase accessibitiy by clearing corridor of vegetation changes to increase trail lifespan by repairing tread affected by erosion. Repair damage caused by visitor usage by repairing ruts and braiding. 11. T-93, perk canyon trail - 1.9 miles of: improving tread by removing berms of edge of trail, restoring flat out-sloped trail and removed vegetation from the tread. Changes to increase accessibity by clearing corridor of vegetation. Changes to increase trail lifespan by building grade-dips to shed water and repairing tread affected by erosion. Repair damage caused by visitor usage by repairing ruts and braiding and removing user trails. 12. On sacramento district we treated 4 trails: corral canyon trail - .6 miles of: improving tread by removing berms from edge of trail, restoring flat out-sloped trail and removed vegetation from the tread. Changes to increase accessibility by clearing corridor of vegetation changes to increase trail lifespan by building grade-dips to shed water and repairing tread affected by erosion. Repair damage caused by visitor usage by repairing ruts and braidi

Operating model

Revenue model
Grant-funded. 99% of the money available for current operations came from government grants.
Distribution model
Direct operator. The filing allocates 100% of reported program-service expenses outside its grant, affiliate-payment, and member-benefit lines. This expense classification does not rule out separately announced grant awards.

The verdict

STRONG - A large share of available resources goes toward mission work and the filed numbers largely add up. Some filing-based governance responses are negative or unanswered and expenses are high relative to revenue.

Rating breakdown

  • Financial Efficiency: 98
  • Transparency & Controls: 90
  • Accountability: 70
  • Sustainability: 16
  • Growth: 100

Detailed rating inputs

Financial Efficiency

  • Mission deployment rate: 100%; rating input score 100
  • Program expense ratio: 97.2%; rating input score 97
  • Fundraising efficiency: $292.89 raised per $1 spent on fundraising; rating input score 95; 95th percentile among comparable filings

Transparency & Controls

  • Consistency checks: 100%; rating input score 100; 62nd percentile among comparable filings
  • Pay-setting controls: Limited
  • Foreign activity oversight: Limited
  • Grant itemization coverage: Limited
  • Major donor itemization: Limited
  • Related-party transparency: Limited

Accountability

  • Independent voting board: 100%; rating input score 100; 63rd percentile among comparable filings
  • Governance controls: 2 of 7 controls in place; rating input score 29
    • Conflict-of-interest policy: Fail
    • Whistleblower policy: Fail
    • Document-retention policy: Fail
    • CEO compensation review process: NotApplicable
    • Other executive compensation review process: NotApplicable
    • Form 990 shared with the board: Fail
    • Board meeting minutes documented: Pass
    • Audit committee oversight: Missing
    • Independent financial-statement audit: Pass

Sustainability

  • Operating margin: -9.5%; rating input score 15; 15th percentile among comparable filings
  • Total-asset coverage ratio: 0.13; rating input score 7; 7th percentile among comparable filings
  • Liabilities to assets ratio: 0.14; rating input score 43; 43rd percentile among comparable filings
  • Officer compensation ratio: 17.7%; rating input score 16; 16th percentile among comparable filings

Growth

  • Program expense growth: 15.7% per year; rating input score 100; 80th percentile among comparable filings
  • Revenue growth: 12.7% per year; rating input score 100; 78th percentile among comparable filings
  • Asset growth: 4.7% per year; rating input score 100; 50th percentile among comparable filings

Details

  • Where the money goes: 100% of revenue deployed · 97.2% of spending went to programs
  • Governance: 2 of 2 board members independent · 2 of 7 filing controls reported
  • Programs: 3 filed program accomplishments · $599K in reported program spending
  • Leadership: top reported pay $54K · 4 people listed
  • Consistency: 26 of 26 current checks pass
  • Schedules: 3 filed schedules
  • Filing history: 15 filing years from 2010 to 2024
  • Contacts: How to reach this organization
  • Money network: Resolved incoming and outgoing counterparties from filed money flows.
  • Related organizations: Filed and resolved organization relationships.
  • Grant readiness: Federal tax and exclusion status, award history, and grant-maker relationships.
  • People: Everyone the filings name, and which of them the filings identify by more than a name.

Key Signals

Signals prioritize questions for review. They are not findings of misconduct.

  • High — Accountability: Governance controls: 4 of 6 not reported.
  • High — Sustainability: Operating margin scored 15/100.
  • High — Sustainability: Total-asset coverage ratio scored 7/100.
  • High — Sustainability: Officer compensation ratio scored 16/100.
  • Moderate — Sustainability: Liabilities to assets ratio scored 43/100.